In short : A precast beam-and-hollow-block floor gives an economical slab with little formwork: the joists carry the hollow blocks, then a reinforced concrete topping ties everything together.

Typical dimensions & rules
  • •Typical thickness: 16 + 4 cm (span up to ≈ 4.5 m) and 20 + 5 cm (span up to ≈ 6 m)
  • •Joist spacing: 60 cm (block width)
  • •Topping slab: 4-5 cm with ø5 welded mesh at 15 × 15 cm
  • •Intermediate props every 1.2-1.5 m for at least 7 days, strip progressively
  • •Bearing: at least 10 cm on ring beam or load-bearing wall, and a perimeter ring beam is mandatory
Common mistakes to avoid
  • ✗No props or props removed too early: deflection and cracks
  • ✗Mesh forgotten or badly positioned in the topping
  • ✗Joists with insufficient bearing on the walls
  • ✗Topping concrete poorly compacted or too wet

Local prices by country

Frequently asked questions

What is the maximum span of a 16+4 beam-and-block floor?

About 4.5 m under ordinary residential loads. Beyond that, use 20+5 or a solid slab, after an engineer's advice.

Beam-and-block floor or solid slab?

Beam-and-block is lighter and needs less formwork; a solid slab is stronger for long spans, heavy loads or balconies.

What is the role of: beam-and-block floor slab?

A precast beam-and-hollow-block floor gives an economical slab with little formwork: the joists carry the hollow blocks, then a reinforced concrete topping ties everything together.

What are typical dimensions and rules for beam-and-block floor slab?

Typical thickness: 16 + 4 cm (span up to ≈ 4.5 m) and 20 + 5 cm (span up to ≈ 6 m). Joist spacing: 60 cm (block width). Topping slab: 4-5 cm with ø5 welded mesh at 15 × 15 cm. Intermediate props every 1.2-1.5 m for at least 7 days, strip progressively. Bearing: at least 10 cm on ring beam or load-bearing wall, and a perimeter ring beam is mandatory.

What mistakes should I avoid with beam-and-block floor slab?

No props or props removed too early: deflection and cracks. Mesh forgotten or badly positioned in the topping. Joists with insufficient bearing on the walls. Topping concrete poorly compacted or too wet.

Get it checked by a pro