Administrative guide · 2026
Building permit in Senegal (2026)
Competent authority, required documents, timelines and costs: everything you need to obtain your building permit in Senegal, including from the diaspora.
Competent authority
Application filed online via the TéléDAC platform (one-stop shop), processed by the Urban Planning Directorate; DSCOS inspects site compliance.
Timelines
Official processing time of 28 to 40 days via TéléDAC for a complete file.
Costs
Urban planning tax based on floor area and commune, typically a few hundred thousand FCFA for a villa.
The 5 steps of the process
- 1
Secure the land
Verify the property title with the land registry before spending anything.
- 2
Commission the plans
From an architect registered with the national board — mandatory above certain floor-area thresholds.
- 3
Assemble the file
Gather the documents listed below; an incomplete file is the No. 1 cause of delay.
- 4
Submit and track the application
With the competent authority (or online where available); keep the filing receipt.
- 5
Display the permit and start
Display the permit on site and comply with the requirements (siting, height, easements).
Required documents
- Property title, lease or council resolution
- Architectural plans signed by a registered architect
- Location plan and site plan
- Technical study for buildings of 3 storeys and above
- Project manager's insurance certificate depending on the project
Indicative information subject to change — always confirm the exact list with the local authority or your architect.
Frequently asked questions
Is a building permit mandatory in Senegal?
Yes, any new construction in an urban area requires a permit. Building without one exposes you to fines, a stop-work order or even demolition. Application filed online via the TéléDAC platform (one-stop shop), processed by the Urban Planning Directorate; DSCOS inspects site compliance.
How long does it take to get a permit in Senegal?
Official processing time of 28 to 40 days via TéléDAC for a complete file.
How much does a building permit cost in Senegal?
Urban planning tax based on floor area and commune, typically a few hundred thousand FCFA for a villa.
Can I handle the process from abroad?
Yes, through a power of attorney given to a trusted relative, an architect or a mandated professional. Require a copy of the filing receipt and track progress with proof — DiasporaBuild lets you mandate verified professionals and trace every step.
Need a verified architect or contractor?
Mandate verified professionals for the plans and the filing, and track every step remotely.